Design, Optimize and Price Microgrids in Minutes

EASI automatically sizes your solar, battery, and generator assets, pairs them with compatible BoxPower hardware, and delivers a complete turnkey proposal in minutes.

Trusted by Utilities, Project Developers and EPCs

Everything you need for microgrid proposals

From initial sizing to final proposal, EASI streamlines your entire workflow

Automated sizing & dispatch

Optimal configurations for PV, BESS, and generators from minimal inputs.

Turnkey project costs

Full EPC costs—not just hardware. Edit line items, bulk update, and track proposal totals.

KIT library & verification

EASI recommends BoxPower kits ≥ the computed optimal size, then re-checks performance.

Tariffs & resilience

Model TOU/demand charges, export limits, and outage survival for critical loads.

Load tools

Upload CSVs or build synthetic profiles with appliance libraries and seasonal scalers.

Proposal in minutes

Auto-generated reports with inputs, outputs, costs, and financials—ready to share.

How It Works

Three simple steps to go from project requirements to complete proposal

1

Create Project

Add site & load details; select grid-tied or off-grid.

2

Optimize

One click to compute optimal sizes, dispatch, and economics.

3

Select Kit & Propose

Pick the recommended BoxPower kit, finalize costs, and export the proposal.

True turnkey pricing — not just hardware

EASI’s Project Costs tab breaks down EPC categories: Project Management, Permitting, Engineering, Site Prep, Monitoring & Controls, Installed PV, BESS + Inverter, Thermal Generation, Balance of Plant, Commissioning, Logistics & Travel, and Add-ons.

  • Refine Design to edit or bulk-delete line items.
  • Request Estimator Review to confirm pricing assumptions.
  • Status badges: Not Requested, Pending, Approved, Outdated (auto-invalidates when the current price differs from the approved price).
Site Preparation
$20,000.00
Project Management
$15,430.00
Installed PV Cost
$45,250.00
Installed BESS + Inverter Cost
$88,700.00
Installed Thermal Fuel Generator Cost
$30,300.00
Total Project Cost
$204,780.00

Validated models and datasets

Solar & weather datasets

Hourly resource profiles for site-specific production.

Utility tariffs

Comprehensive rate structures with TOU, demand charges, and export rules.

Equipment libraries

PV modules, inverters, batteries, and generator parameters for realistic performance.

EASI computes optimal designs from standard inputs and maps results to BoxPower kits and proposals.

EASI vs. generic modeling tools

EASI

Optimized in one click

Turnkey costs

Proposal automation

BoxPower kit integration

Generic Tools

Highly flexible

Manual iteration

Not proposal-focused

Generic components only

Trusted by industry leaders

See what project developers and partners are saying about EASI

"The exceptional quality and responsiveness consistently set them apart from other vendors. Their beautiful product design and outstanding installation quality truly exceeded our expectations."
PG&E
Pacific Gas & Electric Company
"BoxPower has streamlined the design, procurement, and installation process for solar microgrids in one of the most challenging regions of the world."
Brian Hirsch
DeerStone Consulting in remote Alaska

Trusted by leading companies

Pilot Program

Get early access to EASI and help shape the future of microgrid design

Early Access Program

Pilot access is by invitation. Contact us for pricing and onboarding details. Join leading project developers who are already using EASI to streamline their microgrid proposals.

✓ Full platform access✓ Priority support✓ Feature feedback

Frequently Asked Questions

Everything you need to know about EASI and how it works